From arrival
to qualified output.

Deliver connects verified equipment to productive operation: export packing, site installation, commissioning, local-material and formulation support, trial board production, operator training and lifecycle service.

06 — DELIVER

Delivery is an operating outcome

The project continues
after the line arrives.

A production line is not fully delivered when it leaves the factory. It must be received, installed, started, understood and transferred to the customer’s operating team.04× handover outcomes

Coordinated handover route

From factory release
to stable production.

The exact responsibilities, field-service duration, travel terms and commissioning scope are confirmed in the contract and project plan.

01 / PROTECT

Pack & document

Preservation, export packing, identification, packing lists, manuals and shipment records.

→
02 / RECEIVE

Ship & receive

Loading coordination, arrival inspection, unloading sequence and damage or shortage reporting.

→
03 / COMMISSION

Install & start

Positioning, alignment, utility connection, dry runs and coordinated line startup.

→
04 / HAND OVER

Produce & transfer

Process tuning, board trials, acceptance, training and service handover.

→
Factory site prepared for board production line deliveryPRE-ARRIVAL / 06

Confirm readiness before dispatch

A ready site creates
a faster startup.

Before equipment arrives, both teams confirm that foundations, utilities, access, staffing and trial materials are ready for installation and commissioning.

01Foundations, levels and embedded items completed→
02Power, water, air, drainage and extraction available→
03Unloading, lifting and installation access confirmed→
04Operators, maintenance staff and translators scheduled→
05Local raw materials, consumables and test instruments ready→

Site commissioning sequence

Start methodically.
Reach repeatable output.

Commissioning moves from physical installation to process validation in controlled steps, with observations and parameter changes recorded.

01 / RECEIVE

Unpack & inspect

Check packages, condition, quantities, accessories and shipping records.

02 / INSTALL

Position & connect

Align equipment and connect mechanical, electrical and utility interfaces.

03 / DRY RUN

Function the line

Test movement, controls, sensors, safety circuits and coordinated sequences.

04 / PROCESS

Set materials & formula

Review local materials, agreed formulation basis and initial process parameters.

05 / TRIAL

Produce trial boards

Tune feeding, mixing, forming, handling and finishing toward agreed output criteria.

06 / TRANSFER

Accept & train

Record results, train the customer team and hand over operating responsibility.

From formula to board

Adapt the process
to local reality.

Formulation transfer, optimization and performance commitments apply only to the materials, scope and acceptance basis agreed in the contract.

01
Confirm local raw materials

Review source, variability, moisture, fineness, chemistry and available test information.

02
Establish the starting formulation

Use the customer’s formula or an agreed formulation package as the commissioning baseline.

03
Tune equipment and process settings

Adjust dosing, mixing, forming, curing-related handling, cutting and finishing parameters.

04
Produce and inspect trial boards

Evaluate factory-measurable dimensions, thickness, surface, edges and production consistency.

05
Confirm acceptance and test pathway

Record commissioning acceptance and identify samples requiring curing or accredited laboratory testing.

Capability transfer and lifecycle support

Leave the customer team
ready to operate.

Training is organized by role and supported by practical records for operation, maintenance and future technical service.

01

Operator training

Startup, shutdown, HMI use, parameter control, changeover and routine checks.

02

Maintenance training

Inspection points, lubrication, wear parts, fault isolation and preventive routines.

03

Process guidance

Material preparation, formulation control, quality observations and adjustment logic.

04

Lifecycle support

Remote diagnostics, spare parts, service records and future line optimization.

Deliver-stage outputs

Close the project
with a usable handover.

The stage ends with clear records of installation, commissioning, training, acceptance and remaining support responsibilities.

OUTPUT / 01

Shipping & receipt record

Packing, quantities, arrival condition and exception records.

OUTPUT / 02

Installation record

Positioning, alignment, connections and site completion status.

OUTPUT / 03

Commissioning report

Settings, trial conditions, results, adjustments and open points.

OUTPUT / 04

Trial-board evidence

Material basis, board measurements, photos, samples and test pathway.

OUTPUT / 05

Training & acceptance

Training attendance, handover status and agreed acceptance record.

OUTPUT / 06

Service handover pack

Manuals, spares, contacts, warranty basis and support procedures.

Plan delivery before shipment

Prepare the site.
Prepare the team. Start well.

Share your destination, factory readiness, local utilities, raw materials, formulation status and commissioning requirements. We will define the practical delivery and startup route.

Discuss delivery & commissioning→