Start an inquiry→

Engineering / complete board production solutions

Building board
production engineering.

A coordinated route from board requirements, factory planning and production-line configuration to equipment manufacturing, installation, commissioning and accepted trial production for fireproof and cement-based construction boards.

ENGINEERING PRINCIPLEDefine the board.
Engineer the output.
Every decision begins with raw materials, formulation status, board specification, target capacity and factory conditions.
01 — ENGINEERING

The line is engineered as one connected system

Engineering starts
with the finished board.

We first confirm the board type, thickness, dimensions, capacity, available factory area, local raw materials and formulation status. The process route, automation level, layout and site requirements are then developed around those inputs.06+ connected technical stages

A practical route from first discussion to qualified output

Four project phases.
One coordinated delivery.

The commercial and engineering workflow keeps customer inputs, technical decisions, manufacturing and site preparation aligned from the beginning.

01 / REQUIREMENTS

Define What
You Need to Produce

Confirm factory area, target capacity, board type, thickness and dimensions, available raw materials, utilities and whether an existing formulation is available.

Customer + engineering
02 / PLANNING

Plan the Line
and Factory Interface

The customer provides the factory floor plan. We develop the equipment layout, process route, preliminary foundation requirements, configuration and automation level.

Technical confirmation
03 / EXECUTION

Manufacture Equipment
and Prepare the Site

After scope and order confirmation, equipment manufacturing begins. Confirmed foundation and utility drawings support parallel site preparation by the customer.

Parallel workstreams
04 / STARTUP

Install, Commission
and Start Production

Coordinate delivery, installation, operator guidance, agreed formulation support, process adjustment and trial production against the confirmed acceptance scope.

Accepted project scope
Building board production line application engineeringAPPLICATION / 02

Board-specific configuration

Built around your
board and output targets.

Each system is configured around the target board, available raw materials, formulation status, dimensions, thickness range, curing route, capacity, automation level, utilities and factory space.

01Board material, raw-material & formulation review
02Capacity & process-route planning
03Factory layout & utility planning
04Automation & control integration
05Foundation & site-preparation planning

From raw materials to finished panels

One connected
production route.

Core production and downstream processes are coordinated to turn raw materials into consistent construction boards ready for use or further finishing.

01 / INPUT

Raw Material Storage

Storage and preparation for the selected formulation.

02 / METER

Feeding & Dosing

Controlled delivery for repeatable batches.

03 / PREPARE

Mixing

Uniform preparation before forming.

04 / FORM

Board Forming

Controlled layer build-up and board structure.

05 / STABILIZE

Setting & Curing

Process-specific stabilization and curing.

06 / RELEASE

Demoulding

Board separation with reduced manual handling.

07 / CALIBRATE

Sanding

Thickness calibration and surface finishing.

08 / SIZE

Cutting & Trimming

Finished dimensions, edge control and extraction.

09 / PROCESS

Deep Processing

Optional grooving, edge work and lamination.

10 / OUTPUT

Stacking & Packaging

Finished-board handling and dispatch preparation.

The final route is confirmed after reviewing the formulation, locally available raw materials, product specification, capacity and site conditions. Stages can be supplied as a complete line, an upgrade section or standalone equipment.

Equipment manufacturing and parallel site readiness

Build the equipment.
Prepare the factory.

Manufacturing and customer site preparation proceed as coordinated workstreams after the technical scope, layout and interface requirements are confirmed.

06+Connected project stages
FATAcceptance framework
PLCCoordinated line control
01Accountable engineering route
01

Incoming & fabrication inspection

Critical components, frames and fabricated sections are checked before final assembly.

→
02

Mechanical & electrical verification

Alignment, wiring, sensors, drives and safety circuits are documented.

→
03

Functional and material trials

Operating sequences and agreed material tests are reviewed where project conditions allow.

→
04

Factory acceptance record

Test scope, observations, issue closure and shipment readiness are confirmed.

→
Parallel
site preparation.
01 / RELEASE

Foundation & Utility Drawings

Confirmed construction references are issued according to the agreed equipment layout and project boundary.

02 / REVIEW

Site Readiness Check

Foundation, access, utilities and installation conditions are reviewed before equipment arrival.

Integrated building board production lineINTEGRATION / 04

More than a collection of machines

One line.
One coordinated system.

For complete-line projects, we coordinate production stages, material transfer, controls, utilities, dust extraction and operator access around one practical factory workflow.

01Process layout and material flow
02PLC and automation architecture
03Utilities, extraction and interfaces
04Safety, maintenance and expansion access
Explore production integration →

Engineering for different project stages

Start new.
Upgrade. Go deeper.

Scope can cover a new facility, a capacity or automation upgrade, or downstream processing added to an existing board-production operation.

01 / GREENFIELD

New Factory Project

Complete line planning around the target board, capacity, available space, utilities and operating conditions.

02 / UPGRADE

Existing Line Upgrade

Bottleneck improvement, equipment replacement, automation expansion and material-flow optimization.

03 / EXPANSION

Deep-processing Addition

Cutting, sanding, grooving, edge processing, surface finishing and automatic handling after board production.

Clear engineering
deliverables.

01Process-flow proposal
02Equipment scope and configuration
03Preliminary factory layout
04Capacity and cycle calculation
05Utility and interface requirements
06PLC and control concept
07Foundation and site-preparation drawings
08Factory acceptance plan
09Installation and commissioning plan
10Trial-production and formulation-adjustment basis

From factory acceptance to agreed production output

Delivery continues
through startup.

Documentation, site preparation, installation, commissioning, formulation adjustment and operator training shorten the route from equipment arrival to stable operation.

01

Documents & Site Preparation

Layouts, foundations, utilities, electrical information and construction references within the agreed project boundary.

02

Installation

Equipment positioning, mechanical assembly and electrical connection guidance.

03

Commissioning

Dry runs, control checks, sequence verification and process adjustment.

04

Formula & Trial Production

Agreed formulation support and trial production using confirmed raw materials and operating conditions.

05

Acceptance & Training

Output review against the agreed criteria, operator guidance and lifecycle technical support.

Start with your board-production requirement

Define the board.
We’ll engineer the line.

Share the board type, available raw materials, formulation status, thickness, dimensions, target capacity, factory area or floor plan, utilities and destination market. Our engineering team will help define the practical next step.

Start project discovery→